Then came the acrobatic paint job.
Next, he decided to frame out a wall and rewire some of the electrical. This required squaring off the lower staircase and tackling more drywall.
Then why not add a newly constructed shoe shelf made from the old floor boards pried loose from the original landing?
Love it!
No comments:
Post a Comment